Worldwide delivery and assembly
We are happy to support you and your team before, during and after the commissioning of your new system. Our service packages include the installation of interfaces and laser safety precautions as well as acceptance welding on existing customer systems (robot machine, CNC system, etc.). The programme also includes training and process qualification, drawing on our decades of expertise in the field of laser technology. During operation, you benefit from our remote access support, regular inspections and software updates. Rely on our customised services to ensure the maximum efficiency and safety of your systems.
Remote access and immediate assistance via service hotline (Mon-Fri)
Annual basic inspection of laser optics and robot system
Software update for laser technology (HMI)
Electrical maintenance with data backup
The proven metal 3D printing system that started it all. A versatile technology that enables unmanned, direction-independent welding - with both wire and powder LMD (Laser Metal Deposition).
This compact version of our pioneering laser head weighs just 6 kilograms and still brings all the advantages of the ProFocus technology, enabling new applications and geometries.
Revolutionise your metal 3D printing with our complete solution, the ProFocus LaserCell. Turnkey and customised to improve your production and expand your company's economic opportunities.
Do you have questions about our company, our products or our services? Then you've come to the right place.
Yes, our welding systems can be integrated into practically all standard production systems.
Our trailing gas nozzles are very robust and durable. They are equipped with wear parts to withstand the thermal loads during welding as well as spatter, fumes and dirt. In addition, our nozzles can be designed with or without cooling, depending on the operating conditions. Furthermore, the gas distribution in the trailing gas nozzles and the outflow from the nozzle have been optimised using modern flow simulation methods so that the nozzles provide a laminar shielding gas film as quickly and efficiently as possible.
Depending on the size of the trailing gas nozzle, the gas consumption is approximately between 20 and 40 litres/min. With this amount of gas, a much larger area can be covered on the component than is possible, for example, with welding torches with large gas lenses.
You are currently viewing a placeholder content from Brevo. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from Turnstile to submit the form. Please note that doing so will share data with third-party providers.
More InformationYou need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.
More Information